As signed by Michigan’s Governor, SB 1197 (2018 | MI) will:
- Include a plan for recruiting, training, and using Michigan workers for the tunnel project;
- Allow for multiple utilities to use the tunnel;
- Provide that the tunnel is built to last and will contain potential oil spills in the Straits of Mackinac;
- Limit liability for the state, the authority, and members of the authority;
- Require that all necessary government approvals be obtained for the tunnel;
- Prohibit the use of eminent domain to acquire property for the project;
- Ensure the state bears no cost for design, construction, operation and maintenance of the tunnel;
- Ensure that any privately owned portion of the project – including the above-ground entrances and any utility lines within the tunnel – are subject to taxation; and
- Reimburse the MBA for any net loss of profit for leasing space for telecommunication lines.
Upmatters | Legislation signed to protect the Great Lakes, provide energy security, create jobs
Refreshing our recollection:
Michigan has a pipeline company that wants to put in a tunnel. There’s people on both sides. How do you solve it?
SB 1197 (2018 | MI) which will:
- create the The Mackinac Straits Corridor Authority
- not allow the authority to use eminent domain
- not allow the authority to be sued
- will be governed by 3 governor appointees with 6 year terms
- The MI Governor’s policy statement
- “protect the Straits of Mackinac and the Great Lakes while ensuring energy stability for Michigan.”
WWMT | Senate passes bill creating new authority to oversee Line 5 utility tunnel