What group studied variable speeds on Texas roads? Texas A&M Transportation Institute
Why? HB 2204 from 2013 legislation required it.
What roadways did TTI study?
-
Urban Congestion Site: Westbound (WB) State Loop (SL) 1604 between US 281 and IH-10, San Antonio
-
Construction Work Zone Site: IH-35 northbound (NB), MM 297 – MM 301, Temple
-
Weather-Related Site: Eastbound (EB) and WB IH-20 at Ranger Hill, Eastland County
What was the result? Yes, variable speed would be beneficial to address congestion, weather and construction, but they have 7 suggestions:
-
Use permanent equipment (procurement opportunity)
-
A wider separation of the sensors and signs
-
Utilize a more comprehensive and rigorous site selection process
-
Account for more failure conditions in both equipment and communications
-
Improve the overall algorithm (procurement opportunity)
-
Real-time data exchange to other agencies, such as the Department of Public Safety. (procurement opportunity)
-
Significant and on-going public outreach is necessary
Variable Speed Pilot Project Study from TTI at TXDOT request